摘要
水布垭电站接入系统设计(一次部分)通过审查后,在电站附近将新建500kV开关站。电网结构变化后的情况说明,电站电气主接线方案可以优化。文章围绕主接线方案优化展开了较为深入的技术、经济分析,定性、定量地进行了论证。最终确定的优化方案,满足技术要求,节省投资约8千万元。
A new 500 kV switch station will be build near shuibuya hydropower station after the cutover design of shuibuya hydropower have been censored .The changed network structure show the main electric connection project can be optimzed. This paper surrounds it carries through technical and economical analysis relatively, which had determined the nature and fixed quantify. The determinated project finally fill the technical need and save about 80 million yuan for investment.
出处
《华中电力》
2005年第3期36-39,共4页
Central China Electric Power
关键词
水布垭电站
电气主接线
优化
shuibuya hydropower station
main electric connection project
optimizing