摘要
分析韶钢120t转炉除尘水处理系统存在问题及原因,结合现场实践提出改进措施及解决此类问题的观点和思路.
The problems encountered in the dust-water treatment system for the 120 t converter at SISG are analyzed, solutions to them put forward, and appropriate modifications to the system suggested, based on the production practice.
出处
《南方金属》
CAS
2005年第3期35-36,共2页
Southern Metals
关键词
斜板沉淀器
除尘水处理
对策措施
inclined plate grit chamber
dust-water treatment
measures