摘要
对韶钢二轧厂直径15m旋流沉淀池结构施工图设计的优化、修改,不但为相邻建构筑物的同时施工提供了条件,同时也缩短了工期,并有效地降低了工程投资.阐明结合施工进行优化设计是降低工程投资的有效途径.
The design of the revolving sedimentation tank of 15 M in diameter at the No.2 Rolling Mill of SISG was revised and optimized, in order to cut short the construction time, cut down the investment cost, and provide convenience for the simultaneous construction of neighboring buildings. It was indicated that an effective way of reducing the investment cost of a project would be to optimize the design of the project, while taking the construction of the project into account.
出处
《南方金属》
CAS
2005年第3期44-46,共3页
Southern Metals
关键词
旋流沉淀池
人工挖孔桩支护
环梁
优化设计
工程投资
revolving sedimentation tank
support with manually dug piles
ring beam
optimized design
project investment cost