盖挖逆筑钢管中柱安装施工技术 被引量:18

The Erection Construction Techniques with the Covered Excavation and the Inverted Masonry for the Steel Pipe Columns
下载PDF
导出
摘要 在地铁施工中,考虑到施工过程中结构的安全性、经济性及交通影响等方面的因素,盖挖逆筑法得到广泛应用。钢管柱安装施工是盖挖逆筑法施工中的关键工序,因此重点阐述了钢管柱的安装施工方法。 In the construction of the underpa ss , considering about the factors of the safety, economy, and traffic influence, e tc. of the structure in the course of the construction, the construction techniq ue with the covered excavation and the inverted masonry had been widely used. Th e erection construction technique for the steel pipe columns is a key process of the construction technique with the covered excavation and the inverted masonry , so this paper emphatically expounds the erection construction technique for th e steel pipe columns.
作者 韩振明
出处 《科技情报开发与经济》 2005年第8期F003-F004,共2页 Sci-Tech Information Development & Economy
关键词 盖挖逆筑法 钢管柱安装 自动定位器 technique with covered excavation and inverted ma sonry erection of steel pipe column auto-positioner
  • 相关文献

同被引文献42

引证文献18

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部