期刊文献+

乌江三桥620kN缆索吊机的设计 被引量:1

Design of Cable Conveyer 620kN for Third Bridge over Wu River
下载PDF
导出
摘要 乌江三桥位于重庆市彭水县乌江上,采用主跨为140m的钢筋混凝土等截面悬链线无铰箱形拱,拱肋纵向分7段预制安装。缆索吊机采用塔架为固结,塔顶索鞍为可移动式,一侧用预应力锚索结构作为主锚碇。主要介绍缆索吊机设计,以及笔者的体会和建议。 Third bridge over Wu River is located in Conqing city's Pengshui county,has been adopting a arch which is reinforced concrete,non-articulated and box ribbed,with 140m main span,constant section,cantenary and 7-segmental rib in longitudinal direction.The cable conveyer has been using consolidated pylon and the mobile tower saddle,its side takes prestressed anchor rope structure as the main deadman.The paper introduces chiefly the design of cable conveyer along with the knowledge and suggestions of author.
作者 刘景山
出处 《辽宁交通科技》 2005年第6期49-51,共3页 Liaoning Communication Science and Technology
  • 相关文献

同被引文献5

  • 1都昌林,马学峰,龚志刚.大跨径无支架缆索吊吊装系统设计与施工[J].公路交通科技,2004,21(9):74-77. 被引量:19
  • 2交通部第一公路工程总公司.公路施工手册·桥涵[M].北京:人民交通出版社,2003.
  • 3JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 4GB 352-88,密封钢丝绳[S].
  • 5GB 1102-74,圆股钢丝绳[S].

引证文献1

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部