期刊文献+

一种数据仓库项目过程的混合模型

A Hybrid Model of Data Warehouse Project Process
下载PDF
导出
摘要 提出一种数据仓库过程混合模型,该模型采用线型模式和迭代模式结合的开发模式,将工程流程分为技术体系构建和分析应用开发两个平行的部分。它能够涵盖大部分数据仓库项目的开发流程和活动,并且由于其与软件过程框架的相似性,易于开发团队在项目管理中采用。 This paper proposes a hybrid model of data warehouse process. The process model combines linear model and iteration model. Theengineering disciplines of the process model are divided into two part: technology system construction and analytical application developing. Theprocess model can cover all developing workflows and activities of most data warehouse project, and be prone to project management because of theresemblance between it and the software process.
出处 《计算机工程》 CAS CSCD 北大核心 2005年第12期73-74,83,共3页 Computer Engineering
关键词 数据仓库 过程 线性模型 迭代模型 Data warehouse Process Linear model Iteration model
  • 相关文献

参考文献5

  • 1Ponniah P. Data Warehouse Fundamentals. Jonh Wiley & Sons, Inc.,2001.
  • 2Inmon W H, Imhoff C, Sousa R. Corporate Information Factory. (2nd Ed). New York: John Wiley& Sons, 2001.
  • 3RoyceW(美)周伯生 廖彬山译.软件项目管理:一个统一的框架[M].北京:机械工业出版社,2002-08..
  • 4AdelmanS MossLT(美) 薛宇 王剑锋译.数据仓库项目管理[M].北京:清华大学出版社,2003-02..
  • 5Moss L T, Atre S. Business Intelligence Roadmap: The Complete Project Lifecycle for Decision-support Applications. Addison Wesley,2003.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部