期刊文献+

静态单机调度问题改善全局性能的滚动策略

Rolling strategy with improving global performancefor static single-machine scheduling
下载PDF
导出
摘要 借鉴控制界对滚动时域控制性能研究的思路,对一类具有可分的正规性能指标的大规模静态单机调度问题,提出了一种子问题带终端约束的滚动调度策略.在这种滚动调度策略下,全局调度的性能可以进行一定程度的评价和分析.性能分析的结论是,随着局部调度的滚动进行,全局调度性能可以不断改善,初始调度性能是全局最终调度性能的一个上界. <Abstrcat> Following the idea of the performance studies of receding horizon control in control field, a kind of rolling scheduling strategy, in which the sub-problems with terminal constraint are given, is presented for a kind of large scale static single-machine scheduling problem with separable regular criteria. The performances of global schedules can be evaluated and analyzed to a certain extent under this rolling scheduling strategy. It is concluded that the global performance is getting better and better as local scheduling is carried on and the performance of the initial schedule is an upper bound of the ultimate global schedule.
作者 王冰
出处 《系统工程学报》 CSCD 北大核心 2005年第3期308-312,共5页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(60274013) 山东大学青年科学基金资助项目(11010053187075) 山东大学威海分校科研资助项目(XZ03040).
关键词 预测控制 单机调度 滚动调度策略 滚动窗口 终端约束 predictive control single-machine scheduling rolling scheduling strategy rolling window terminal constraint
  • 相关文献

参考文献10

  • 1席裕庚.动态不确定环境下广义控制问题的预测控制[J].控制理论与应用,2000,17(5):665-670. 被引量:71
  • 2Ovacik I M, Uzsoy R. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup-times[J]. International Journal of Production Research, 1994, 32(6): 1243-1263.
  • 3Singer Marcos. Decomposition methods for large job shops[J]. Computers & Operations Research, 2001, 28(3) : 193-207.
  • 4Chand S, Traub R, Uzsoy R. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates[J]. Annals of Operations Research, 1997, 70: 115-125.
  • 5Ovacik I M, Uzsoy R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times[J].International Journal of Production Research, 1995, 33: 3171-3192.
  • 6Fang J, Xi Y G. Rolling Horizon job shop rescheduling strategy in the dynamic environment[J]. International Journal of Advanced Manufacturing Technology, 1997, 13(3) : 227-232.
  • 7席裕庚,耿晓军.连续非线性系统预测控制的次优性分析[J].自动化学报,1999,25(5):673-676. 被引量:3
  • 8Mayne D Q, Michalska H. Receding horizon control of nonlinear systems[J]. IEEE Trans. Automat Contr., 1990, 35(7) : 814-824.
  • 9Dessouky M I, Deogun J S. Sequencing jobs with unequal ready thnes to minimize mean flow time[J]. SIAM Journal on Computing,1981, 10(1): 192-202.
  • 10Chu Chengbin. Efficient heuristics to minimize total flow time with release dates[J]. Operations Research Letters, 1992, 12:321-330.

二级参考文献2

共引文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部