本文就制盐工程的工艺特征,阐述了温度、压力、流量、液位的仪表安装调试时应注意的问题及仪表测量系统必需采取的防堵塞、防干扰、防冻保护措施。
Based on the technological characteristics of salt making engineering,this paper elaborates problems that should been paid attention to in the installation and commissioning of instruments for temperature,pressure,flow and liquid level as well as necessary anti-blocking,anti-disturbing and anti-freezing protection measures that must be adopted for instruments measuring system.