摘要 高水头龙抬头式明流泄洪洞发生空蚀的部位一般位于反弧末端下游边墙及底板上,因此研究该部位的掺气减蚀设施具有十分重要的应用价值。结合二滩水电站1号泄洪洞,研究了反弧段边墙掺气问题,基于掺气挑坎设计中应遵循的基本原则,提出了一种新型的斜侧收缩式掺气挑坎体形,并分析了影响侧收缩掺气挑坎挟气量及挑坎下游水流流态的因素。 The cavitation damage usually appears on the sidewalls and the plate downstream of high head spillway elbow. Therefore, it is very important to study sidewall aeration for safe operation of the ogee spillway tunnel. The sidewall aeration for the first spillway tunnel of Ertan Hydropower Plant is deeply studied in this paper. Basic principles for design of the aerator are described, and a new aerator, that is the side contracted ramp, is presented. Furthermore, factors affecting the flow pattern and aeration are also analyzed.
出处 《水力发电》 北大核心 2005年第4期31-34,共4页 Water Power
关键词 龙抬头式明流泄洪洞 边墙 掺气减蚀 侧收缩掺气挑坎 ogee spillway tunnel side-wall aeration side contracted ramp
  • 相关文献

参考文献7

  • 1谢省宗 陈文学.紫坪铺水利枢纽1、2号泄洪排沙洞掺气减蚀设施水力学试验缩尺影响论证报告[R].中国水利水电科学研究院水力学所,2004..
  • 2夏毓常.龙抬头式泄洪洞空蚀问题探讨[A]..水力计算论文集[C].北京:中国水利水电出版社,1997.136-151.
  • 3冯家山水库溢洪洞原型观测组.冯家山水库溢洪洞通气减蚀原型观测研究报告[R].,1981..
  • 4陈文学.二滩水电站1号泄洪洞水工常压模型试验研究报告[R].中国水利水电科学研究院水力学所,二滩水电开发有限责,2002..
  • 5张东.二滩水电站1号泄洪洞水工减压模型试验研究报告[R].中国水利水电科学研究院水力学所,二滩水电开发有限责,2002..
  • 6陈文学 李世琴.紫坪铺水利枢纽1、2号泄洪排沙洞掺气减蚀设施水力学试验研究报告,常压水工模型试验[R].中国水利水电科学研究院水力学所,2004..
  • 7肖兴斌,王才欢,王业红.弧形闸门突扩跌坎式通气减蚀研究进展综述[J].长江科学院院报,2000,17(5):1-4. 被引量:20

二级参考文献9

  • 1时启燧,掺气减蚀设施 [R],1994年
  • 2杨顺玉,泄水工程与高速水流,1992年
  • 3张韦长,全国高水头泄水建筑物水力等问题论文集.上,1987年
  • 4朱荣林,中国水利科学研究院科学研究论文集.21,1986年
  • 5潘水波,通气减蚀设施的设计与应用 [R],1985年
  • 6邵嫫嫫,国际水工模型试验会议译文选集,1984年
  • 7四川大学高速水力学国家重点实验室,小浪底枢纽工程 #2孔板泄洪洞减压模型试验 [R],1999年
  • 8王才欢,小浪底水利枢纽 #3孔板泄洪洞中间闸室掺气模型中间阶段试验成果报告 [R],1999年
  • 9周赤,三峡工程泄洪深孔突扩跌坎掺气体型1/20单孔水工模型试验研究报告 [R],1998年

共引文献23

同被引文献111

引证文献10

二级引证文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部