摘要
龙滩水电开发有限公司在抓工程建设的同时,高度重视工程环保水保设施的建设与管理工作,在环保水保管理工作中做到了“思想认识、机构人员、管理措施、建设投资、规划设计、综合监理”六到位,开展创建“绿色龙滩”活动,环保水保建设与管理工作卓见成效。
The Longtan Hydropower Development Co.,Ltd., while concentrating on the project construction, pays great attention to the construction and management of the environmental protection and water and soil conservation facilities. Proper steps have been done in the following 6 aspects: ideologically understanding; organizational personnel; managerial measures; construction investment; planning and designing; comprehensive supervision. An activity of establishing a green Longtan project has been conducted. The work of the construction and management of the environmental protection and water and soil conservation is fruitful result.
出处
《水力发电》
北大核心
2005年第4期47-49,共3页
Water Power