期刊文献+

西气东输管道可靠度预评估 被引量:9

Pre Evaluation on Reliability of West-East Gas Transmission Pipeline
下载PDF
导出
摘要 由于钢管质量、材料性能、内压、意外载荷等因素的不确定性,实际管道总存在一定的失效概率和可靠度。介绍了利用失效评估图和蒙特-卡罗法计算管道可靠度的一种方法,并采用国外目标可靠度指标对西气东输管道的可靠度进行了预评估,结果表明:无论是否存在一定概率的漏检缺陷,西气东输管道的可靠度完全可以满足标准要求;为了提高钢管的可靠度,应在钢管制造及焊接施工过程中严格把关,以避免因人为因素造成缺陷漏检。 The actual pipeline generally occur certain failure probability and reliability due to the indetermination of pipe quality, material property,internal pressure,accident load etc...It introduces a method that use failure evaluation chart and Monte Carlo method to calculate pipeline reliability and pre-evaluate the reliability of West-East Gas Transmission Pipeline by adopting target reliability abroad.The results show that the reliability of West-East Gas Transmission Pipeline fully meets requirements of specification whether it exist certain probability of defects failure inspection or not;In order to improve reliability of pipes,strict inspection shall be performed through manufacture of pipes and welding during construction of pipeline to avoid defects failure inspection caused by man.
出处 《焊管》 2005年第3期62-65,共4页 Welded Pipe and Tube
关键词 西气东输管道 可靠度 失效评估图 预评估 蒙特-卡罗法 west-east gas transmission pipeline reliability failure evaluation chart pre-evaluation monte carlo method
  • 相关文献

参考文献5

  • 1金国粱 陈琳.可靠性与优化及其在石油工业中的应用[M].北京:中国科学技术出版社,1992..
  • 2BS 7910:1999,Guide on Methods for Assessing the Acceptability of Flaws in Fusion Welded Strutures[S].
  • 3Milne,Ainsworth R A,Dowling A R and Stewart A T.Assessment of the Integrity of Structures Containing Defects,Central Electricity Generating Bord Report[J].Pressure Vessels and Piping.1998,32(2):104.
  • 4BSI PD6493,Guidelines On Method For Assessment of the Acceptability of Flaws in Fusion Welding Structures[S].
  • 5API RP 579:Recommended Practice For Fitness-For-Service[S].

同被引文献51

  • 1张仙风,吕志鹏.基于MATLAB的蒙特卡罗方法在可靠性设计中的应用[J].装备制造技术,2006(4):76-77. 被引量:15
  • 2尹成先,兰新哲,冯耀荣,霍春勇.提高高强度输气管线设计系数的可能性研究[J].天然气工业,2005,25(10):117-119. 被引量:9
  • 3曲慎扬.油气管道可靠性评价指标及其计算[J].油气储运,1996,15(4):1-4. 被引量:24
  • 4赵新伟.提高天然气管道在一类地区设计系数的可行性研究[C]∥中国国际石油与天然气管道会议论文集(下册),廊坊:中国石油管道公司.2009:803-811.
  • 5ASME B31 ,Code for Pressure Piping[ S].
  • 6CSA Z662 1996,0il and Gas Pipeline Systems[ S].
  • 7LAMB M, FRANCIS A, HOPKINS P. How Do You Assess the Results of a Limit State Based Pipeline Design [ C]//Conference on Risk-based and Limit State Design & Operation of Pipelines. Aberdeen: [ s. n. ], 1998: 795 - 798.
  • 8FRANCIS A, EDWARDS A, ESPINER R. Reliability Based Approach to the Operation of Gas Transmission Pipelines at Design Factors Greater Than 0.72 [ C ]//OMAE. Lisbon : [ s. n. ] , 1998 : 1 - 7.
  • 9ZIMMERMAN T, COSHAM A, HOPKINS P, et al. Can Limit State Design be used to Design a Pipeline Above 80% SMYS[ C]//OMAE. Lisbon: [ s. n. ], 1998 : 1 - 9.
  • 10LAMB M, EIBER R J, McGHEE W. Quantifying Pipeline Design at 72% SMYS as a Precursor to Increasing the Design Stress Level [ R ]. Reports for the Pipeline Research Council International, inc. GRI, report No. GRI 00/0233,2000.

引证文献9

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部