摘要
介绍了淤泥地质台后采用粉喷桩、塑料排水板、土工格栅、反压护道等措施的设计与施工控制,对台后软基处治工程的施工有指导意义。
This article Introduces the silt geology platform afterwa rds uses the powder spurts and the plastics drain off water the board and grille and back pr essure protects etc design and the construction control of measure , the constru ction has the guidance meaning to the construction of the bridge abutment soft b ase
出处
《浙江交通职业技术学院学报》
CAS
2005年第2期8-12,共5页
Journal of Zhejiang Institute of Communications