泵站技术改造工程建设要把好“四关” 被引量:2

Four Keys for the Pumping Station’s Reconstruction
下载PDF
导出
摘要 针对泵站技术改造工程的特点,结合从事泵站建设和管理工作经验,提出泵站技术改造工程在各个工作阶段应把握的重点:前期工作阶段要重点抓好土建和机电设备检测工作;设计阶段要搞好工程设计参数的复核和设备选型工作;工程施工阶段要严格按照基建程序管理,搞好设备采购和设备安装工作;竣工验收阶段要搞好工程、财务审计和竣工验收资料的整理归档工作。 According to the construction and management practice, pumping station’s features in reconstruction was introduced; key points that should be considered in each step was also proposed. In the earlier stage, focus should be put on construction item and detection of electromechanical equipments, in the primaryd esigns tage,t hep roject design parameters’rechecka ndt ypes’selectioni s especiallyi mportant; int he constructions tage,s trictly carryingo utc onstructionp rocedure ist he focus, purchasinga nd install ofe quipments is also of great importance; in the final, the key becomes the financial audit work and to archive all kind of materials ofp roject’sc hecka nda ccept.
作者 汤汉志
出处 《排灌机械》 2005年第3期49-51,共3页 Drainage and Irrigation Machinery
  • 相关文献

参考文献4

  • 1GB/T50265-97.《泵站设计规范》.[S].,..
  • 2储训 刘复新.中小型泵站设计与技术改造技术[M].河海大学出版社,..
  • 3SL223-1999.《水利水电建设工程验收规程》.[S].,..
  • 4皮积瑞 解广润.机电排灌设计手册(第二版)[M].水利电力出版社,..

共引文献3

同被引文献11

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部