摘要
结合具体的工程实践,探讨了混凝土冬季施工要求,从施工准备、钢筋加工和安装、模板安装等方面,介绍了高寒风沙地区预制梁的施工方案、施工技术要点。
Combined with concrete practice of project,it discus se s requirements of winter construction of concrete and introduces constructive pl ans & main technical points of prefabricated beam in overcold wind & sand area f rom aspects of constructive preparation?production & installation of steel bar and shuttering installation.
出处
《山西建筑》
2005年第13期118-119,共2页
Shanxi Architecture
关键词
T梁预制
冬季施工
钢筋加工
模板安装
prefabricated T beam, wind construction, production of steel bar, shuttering installation