摘要
介绍EBG150型架桥机在过孔及架梁均不符合架桥机的使用条件下,如何过孔及架设50mT梁,提供一个切实可行的方案,增强架桥机的适应性,对同类型桥梁的架设具有指导意义。
This paper introduces how to pass aperture and span 50m T-beam when th e aperture and bridge beam are not accord with type EBG150 bridge machine. A fea sible project is provided for enhancing adaptability of bridge machine and has d irective value for building the same type bridge.
出处
《重庆建筑》
2005年第5期31-33,共3页
Chongqing Architecture