取沙船挖沙对南沙港区营运影响的数学模型分析 被引量:1

Analysis of Numerical Modeling of Effects of Sand Borrowing in Nansha HarborWaters on the Operation of the Harbor
下载PDF
导出
摘要 在广州港南沙港区一期工程建设过程中,常有外来取沙船只进入码头施工水域取沙作业,既干扰了现场的正常施工,又给码头安全带来了严重的隐患。用二维潮流泥沙数学模型模拟了南沙港区水域取沙船挖沙对南沙港区的水动力条件及泥沙运动的影响,分析其利弊,并对港区附近水域采沙规划提出合理性的建议。 During the construction of the Stage I Project of Nansha Harbor reach;non_native sand dredgers often enter the waters of construction area to carry out sand borrowing.This not only has disturbed the normal construction in the fiedl,but also brought about hidden danger to the safety of the ferry.A two_dimensional numerical model of flow and sediment is established to simulate the effects of sand borrowing in waters of Nansha Harbor reach on hydrodynamic conditions and sediment movement in Nansha Harbor reach and analize its advantages and disadvantages.Rational suggestions are put forward for sand borrowing in waters near the harbor reach.
出处 《人民珠江》 2005年第3期17-21,共5页 Pearl River
关键词 数学模型 挖沙影响 因素 建议 南沙港区 numerical model effect of sand borrowing factor suggestion Nansha Harbor reach
  • 相关文献

参考文献6

  • 1罗肇森.河口河道开挖后的回淤计算[J].泥沙研究,1987,(10).
  • 2武汉水利电力学院.河流泥沙工程学[M].北京:水利出版社,1980..
  • 3窦国仁,董风舞,XibingDou.潮流和波浪的挟沙能力[J].科学通报,1995,40(5):443-446. 被引量:126
  • 4李义天,胡海明.床沙混合活动层计算方法探讨[J].泥沙研究,1994,20(1):64-71. 被引量:10
  • 5谢鉴衡.河流模拟[M].北京:中国水利水电出版社,1988..
  • 6李义天.冲淤平衡状态下的床沙质级配初探[J].泥沙研究,1987,(3).

二级参考文献2

  • 1窦国仁,科学通报,1979年,24卷,14期,659页
  • 2窦国仁,水利学报,1963年,2期,13页

共引文献162

同被引文献29

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部