摘要
本文叙述了采用PBM-3聚合物混凝土,通过导管在龚嘴水电站10号冲沙底孔水下58m水深范围内,整体修补了一个封水面,使浮体闸门一次性封水成功。
This article introduces the experience on repairing sealing surface whole by duct casting PBM-3 polymer concrete in the scope under water 58m, which made floating gate sealing success only by one effort.
出处
《大坝与安全》
2005年第2期33-34,41,共3页
Dam & Safety
关键词
龚嘴水电站
PBM
聚合物混凝土
钢模架
水下锚固
导管浇筑
Gongzui hydropower station, PBM, polymer concrete, steel format , anchoring underwater, duct casting