从DCS对环境的要求、接地的要求、电缆敷设的要求等方面,阐述了DCS的安装要求,对DCS调试中存在的主要问题进行了分析,并提出了一些针对性的改进措施。
The installation specifications on distribution control system are introduced from the requirements of DCS on environment, ground connection, cable laying and other aspects. According to the problems existed in debugging process analysis is carried out; in addition, corresponding improvement measures are proposed.