摘要
当山西小营500kV变电站接入系统后,在一定的运行方式下,给系统带来了稳定性问题。针对这一问题,进行论证并提出其安全自动装置的配置方案,在小营500kV变电站工程中加以实施应用,从而解决目前存在的主要问题。
This paper discussed the problem of the staility of the system under the certain operating mode when Xiaoying 500kV substation was connected to the system.The disposition scheme of the automatic safety device was put forward.And also it was adopted in the project of Xiaoying substation so that the main existing problem was solved.
出处
《山西科技》
2005年第3期120-121,共2页
Shanxi Science and Technology