摘要
综采切眼施工中采用锚索、锚杆、铺网联合支护的施工方法,节省了材料,减轻了工作的劳动强度,给综采安装工作提供了方便。
Introduces that using combined support technique with anchor,bolt and support net in comprehensive mining cut construction,to save material,reduce the labour ivtensity,raise the safety,it have extend value.
出处
《山西焦煤科技》
2005年第4期1-2,共2页
Shanxi Coking Coal Science & Technology