摘要
阐述了在不同合同形式下建设工程价差调整的内容和方法,重点分析了应用调值公式调整价差可能存在的问题,对此提出解决的方法和建议。
Describing the contents and methods of adjusting the price differences of construction works under different contract forms, this article performs an analysis of the problems possibly available after adjusting the price differences by using the value adjusting formula prior to presenting proposal and solution thereto.
出处
《铁路工程造价管理》
2005年第3期10-12,共3页
Railway Engineering Cost Management
关键词
建设工程
价差
调整
方法
construction work, price difference, adjust