摘要
文中改变传统的矿图填图模式,从“填图-存图”模式转化为保存填图数据,建立填图数据的动态数据库,维护了巷道的连续性和完整性。并对采掘工程平面图的填图数据进行分类分析,最后给出了各类动态填图的实现过程。
In the paper, the t raditional charting mode of the mine map, i.e. charting-storing, is changed to be current dynamic charting mode that is to store charting data and create dyna mic database of it, thus keeping the continuity and integrity of the roadway. I n addition, the charting data of the plan view of the mining engineering are cla ssified and analyzed and the procedure to realize various kinds of dynamic chart ing modes is given as well in the paper.
出处
《矿山测量》
2005年第2期26-28,共3页
Mine Surveying