期刊文献+

D-B总承包模式的评标管理研究 被引量:3

Research on the Bid Evaluation Management of Design-Build Delivery Systems
下载PDF
导出
摘要 近年来,D-B(设计-建设)总承包模式已被越来越多的业主和政府部门所采用。而对业主来讲,选择最有价值(best-value)的承包商(质量高、工期短、造价低的总承包商)无疑是最需要的。通过分析研究国内外D-B总承包模式的评标,建立了D-B总承包模式的评价指标,根据总承包商提出的投标报价、工期和他的技术水平,提出了两阶段综合评标模型,运用这个模型,综合评出最有价值的总承包商。 In recent years, more and more private owners and public sectors choose to use design-build delivery systems in developed countries and areas such as Europe, American, Hong Kong et al. Design-build delivery systems have been successful into application from famous UK Channel Tunnel[5] to common buildings, roads, bridges et al. To the client, it is most needed to choose the best-value contractor (high quality, short duration, low cost) without doubt. This paper presents bid evaluation factors and two-stage bid evaluation model for design-build delivery systems by analysis of domestic and international bid evaluation. The client can use the bid evaluation model to select out the best-value general contractor according to his bid price,bid duration and technique level.
出处 《工程建设与设计》 2005年第5期64-67,共4页 Construction & Design for Engineering
关键词 D-B总承包模式 评标模型 最有价值 总承包商 design-build delivery systems bid evaluation model best value general contractor
  • 相关文献

参考文献11

  • 1Napthine, R.,and Smart, R. (1995). "Design and build - Lessons from the UK channel tunnel terminal."roc. lnstn Civ.Engrs, Civ. Engng, 108, Aug., 123-130.
  • 2孙继德.项目总承包模式[J].土木工程学报,2003,36(9):51-54. 被引量:84
  • 3张宗濂.香泗铁路工程总承包得失之我见[J].有色冶金设计与研究,1996,17(2):54-58. 被引量:4
  • 4苏鸿.柳州双冲桥项目勘察设计施工总承包的招标实践[J].广西交通科技,2002,27(3):41-42. 被引量:2
  • 5Molenaar, K. R., and Gransberg, D. D. (2001). "Design-builder selection for small highway projects." J. Mgmt. in Engrg., ASCE, 17(4):214-223.
  • 6Helbsman, Z. J. (1995). "A+B bidding method - Hidden success story for highway construction." J. Constr. Engrg. and Mgmt., ASCE, 121 (4):430-437.
  • 7Herbsman, Z. J., Chen, W. T., and Epstein, W. C. (1995). "Time is money:Innovative contracting methods in highway construcfion."j. Comtr. Engrg.and Mgmt.,ASCE, 121(3): 273-281.
  • 8张水波,何伯森.工程建设“设计-建造”总承包模式的国际动态研究[J].土木工程学报,2003,36(3):30-36. 被引量:91
  • 9Opfer, N. D., Son, J.,and Korman, T. (2002). "Public sector design-build selection criteria." AACE International Transactions.,PM.04.1-PM.04.7.
  • 10建设部文件.关于培育发展工程总承包和工程项目管理企业的指导意见[Z].,2003..

二级参考文献29

  • 1张宗濂.香泗铁路工程总承包得失之我见[J].有色冶金设计与研究,1996,17(2):54-58. 被引量:4
  • 2丁士昭.建设监理导论[M].上海:上海快必达软件出版发行公司,1991..
  • 3丁士昭 等.建设项目总承包课题报告[R].,1991年..
  • 4Donald S Barrie & Boyd C Paulson, Jr. Professional construction management including CM, design-construction and general contracting, Third edition, McGraw-Hill Inc, 1992.
  • 5Harold Kerzner. Project management: a system approach to planning, scheduling and controlling, International Thomson Publishing Inc, 1995.
  • 6Bennett, J., Pothecary, E., Robinson, G. (1996). "Designing and building a world-class industry." Rep. No. ISBN 07049 1170 1, University of Reading, Reading, UK
  • 7HBE (2001). Design-Build Continues to Grow in Popularity,Blueprint, Volume 1, no. 1.
  • 8Florida Institute of Consulting Engineers ( 1991). Design/Build for Design Firms, published by American Consulting Engineers Council
  • 9Mosey, David (1998). Design and Build in Action, Chandos Publishing, England,
  • 10Beard, J. L., Loulakis, M. C., Wundram, E. C. (2001).Design-Build: Planning through Developnent. McGraw-Hill.

共引文献182

同被引文献25

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部