摘要 研究了BOT模式的效率问题,分析了政府和项目公司之间的委托代理关系,建立了政府和项目公司之间的博弈模型,讨论了在信息对称和信息不对称情形下政府和项目公司的最优战略.通过对BOT模式和承建制的比较分析表明,对于技术水平高、不确定因素多和难以控制的建设项目,采用承建制会导致项目公司的“道德风险”,而采用BOT模式是有效的,它解决了在信息不对称情形下委托代理关系的“道德风险”问题,从而从机理上论证了BOT模式的有效性. The effectiveness of BOT (build-operate-transfer) scheme is discussed. The principal-agent relationship between the government and the project company is analyzed. The principal-agent game model between them is formulated as well. The dominant strategies for the government and the project company are discussed under both symmetric information and asymmetric information conditions. By comparing BOT scheme with contract-for-work scheme for complicated infrastructure projects, it is shown that the latter will lead to the moral hazard from the project company, and the former is more effective to reduce the moral hazard under the case of asymmetric information. Therefore the mechanism effectiveness of BOT scheme is proved.
出处 《东南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2005年第3期489-492,共4页 Journal of Southeast University:Natural Science Edition
基金 国家自然科学基金资助项目(70071049 70371019)
关键词 BOT 委托一代理 道德风险 有效性 build-operate-transfer principal-agent moral risk effectiveness
  • 相关文献

参考文献10

  • 1Tiong R L K, Alum J. Financial commitments for BOT projects [ J ]. International Journal of Project Management, 1997,15(2) :73 -78.
  • 2Kumaraswamy M M, Zhang X Q. Governmental role in BOT-led infrastructure development [ J ]. International Journal of Project Management, 2001, 19 ( 3 ) : 195 -205.
  • 3Xing W, Wu F F. A game-theoretical model of private power production[J]. Electrical Power and Energy Systems, 2001,23(3) :213 -218.
  • 4Xing Weiguo, Wu Felix F. Economic evaluation of private power production under uncertainties [ J ]. International Journal of Electrical Power and Energy Systems,2003,25(2) :167 - 172.
  • 5Yeo K T, Tiong R L K. Positive management of differences for risk reduction in BOT project[ J ]. International Journal of Project Management, 2000, 18(4) :257 -265.
  • 6Kang Chaochung, Feng Chengmin, Khan H A. Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach [ J ]. Computers and Operations Research, 2005, 32(6) :1633 - 1654.
  • 7Smith N, Zhang Hao, Zhu Yiran. The Huaibei power plant and its implications for the Chinese BOT market[ J ]. International Journal of Project Management,2004, 22(5) :407 -413.
  • 8罗顺梅.我国政府在BOT项目融资中的风险分担[J].经济与管理,2002,16(5):15-16. 被引量:11
  • 9邬海澜.BOT公路项目在我国的实施[J].企业经济,2002,21(2):48-49. 被引量:3
  • 10左小德,梁云,米娜.BOT投资方式及在我国的实践[J].科技管理研究,2000,20(5):54-58. 被引量:6