介绍了南京地区220kV变电站无人值班改造的两种模式,就改造设计中面临的一些问题、改造后监控系统与微机防误系统的联系、监控系统与保护管理机的信息交换等几个方面问题进行了分析探讨。
In this paper,two modes of integrated automation reconstruction in 220 kV substations in Nanjing are introduced. Problems on the design of reconstruction,,the communication between supervision control system and computer-aided maloperation-proof system,the information exchange between the supervision control system and relay management system are analyzed and discussed in detail.
出处
《江苏电机工程》
2005年第3期50-51,共2页
Jiangsu Electrical Engineering
关键词
变电站
无人值班改造
监控系统
substation
integrated automation reconstruction
supervision control system