摘要
文章采用有限元计算的方法对东楼隧道施工中病害进行分析,通过不同施工工序给隧道结构体系所带来力学上的差异,揭示了施工工序对隧道结构体系稳定的重要性,同时也表明理论分析计算在隧道设计和施工中占有重要的地位。
By means of finite element method this paper analyzes the causes of defects in Donglou tunnel during construction. It is indicated that different construction procedures generate mechanical differences to tunnel structure system, so construction procedure is important to tunnel structure system. It is also indicated that theory analysis is important to tunnel design and construction.
出处
《现代隧道技术》
EI
北大核心
2005年第3期23-27,共5页
Modern Tunnelling Technology
关键词
隧道病害
施工步骤
围岩屈服接近度
应力
Tunnel defects
Construction procedure
Surrounding rock
Degree of approaching to yield
Stress