期刊文献+

乌鞘岭特长隧道3#斜井施工方案比选及经济技术分析 被引量:3

Comparison and Selection of Construction Methods and the Economical Technical Analysis for the Inclined Shaft with Rails and Without Rails of the Work Area of 3# Inclined Shaft of the Wushaoling Extra-long Tunnel
下载PDF
导出
摘要 通过乌鞘岭特长隧道3#斜井工区施工实践,简要介绍了有轨、无轨斜井施工方案的比选和有轨、无轨斜井工程经济技术分析的方法,并总结了无轨斜井施工的优缺点。 In the light of the construction of the work area of 3# inclined shaft of the Wushaoling Extra-long Tunnel, the paper introduces the comparison and selection of construction methods and the economical and technical analyses for the inclined shaft with rails and without rails and summarizes both the advantages and disadvantages of the construction for the inclined shaft without rails.
作者 周建奇
出处 《国防交通工程与技术》 2005年第2期49-52,共4页 Traffic Engineering and Technology for National Defence
关键词 乌鞘岭特长隧道 有轨斜井 无轨斜井 施工技术 铁路隧道 inclined shaft with rails inclined shaft without rails economical analysis comparison and selection of construction methods
  • 相关文献

参考文献1

  • 1TB 10204-2002.铁路隧道施工规范[S],2002.

同被引文献22

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部