摘要
针对国产早期200MW汽轮机组热力系统存在的问题进行合理的优化与改进,提高汽轮机组运行的经济性和安全性。
In the light of the problems existing in thermodynamic system of a earlier home-made 200 MW steam-turbine,appropriate optimization and improvement were carried out,and the economy and safety of the turbine operation were enhanced.
出处
《湖北电力》
2005年第3期31-32,45,共3页
Hubei Electric Power
关键词
热力系统
优化
改进
improvement system
optimization
improvement