期刊文献+

糯扎渡水电站装机容量论证 被引量:4

Demonstration on installed capacity of Nuozhadu Hydropower Project
下载PDF
导出
摘要 糯扎渡水电站装机容量论证统筹考虑了上下游梯级电站间的合理协调,供电区的负荷水平及负荷特性、电源结构及特性,机组制造水平及运输条件,枢纽布置,动能经济指标,送出工程的经济性和市场竞争力等方面的因素,针对核心问题和关键因素,经综合技术经济比较,最终确定电站装机规模。 Demonstration on installed capacity of a super hydropower project is provided with very difficult and challenge. In making a reasonable decision, the research of multifarious factors is a must. In order to demonstrate installed capacity of Nuozhadu hydropower project, the various factors that are coordination between up and down cascaded hydropower project, load level and load-characteristics and framework of electrical source of power supply district, manufacture level and transport condition of generating unit, hydraulic structure design, energy Economy Index, economical rationality of transmission line, market competition ability and so on, are investigated. Aiming at important matters and factors, technical and economic Index have been compared synthetically. And then, the installed capacity of Nuozhadu hydropower project is recommend.
出处 《水力发电》 北大核心 2005年第5期14-16,共3页 Water Power
关键词 装机容量 枢纽布置 可行性 糯扎渡水电站 installed capacity general layout feasibility Nuozhadu Hydropower Station
  • 相关文献

同被引文献14

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部