摘要
从原材料选择、配比优化、施工控制等方面,通过综合控制措施,在满足设计和施工要求的前提下,探索控制大体积混凝土表面收缩裂缝、沉降裂缝和温度裂缝产生的途径。
This paper discusses the approach of controlling crack of largeconcrete foundation board caused by shrinking,sinking and temperature based on the analysis on choice of materials, optimizing prescription and construction control by means of comprehensive control measures and under the condition of design and construction.
出处
《平顶山工学院学报》
2005年第2期7-9,共3页
Journal of Pingdingshan Institute of Technology
关键词
大体积混凝土
裂缝
综合控制
large concrete
crack
comprehensive control