永和大桥钢管拱肋节段吊装施工控制 被引量:2

Construction Controlling of Suspending Placement in Steel Tubular Arch Truss Articulations of Yonghe CFST Arch Bridge
下载PDF
导出
摘要 结合南宁市永和大桥的施工过程,主要介绍了该次钢管拱肋吊装施工技术的要点。该次钢管拱肋吊装采用的一些关键性施工技术成功地解决了实际施工过程中的一系列难题,是对我国钢管混凝土拱桥的缆索吊机斜拉扣挂悬臂拼装施工方法的进一步完善,对今后同类桥梁的施工,具有很好的参考价值。 Yonghe CFST arch bridge locates in the outer ring road of Nanning city. The key technologies of steel tubular arch rib hoisting construction are expatiated in this paper. These technologies solved some knotty problem in construction and improve the non-support cable hoisting with cableway crane with cable-stayed cantilever construction technology of our country. These construction techniques provide some available references for the CFST arch bridge construction.
作者 谭立心
出处 《武汉理工大学学报》 EI CAS CSCD 北大核心 2005年第7期106-108,共3页 Journal of Wuhan University of Technology
关键词 钢管混凝土拱桥 钢管拱肋 施工控制 arch-bridge of concrete filled steel tubular bridge steel tubular arch rib construction control
  • 相关文献

参考文献3

  • 1杨齐海,夏万军.武汉江汉三桥钢管拱桁架吊装方案的比选[J].施工技术,2000,29(6):31-33. 被引量:3
  • 2JTJ041-2000.路桥集团第一公路工程局.公路桥涵施工技术规范[S].[S].北京:人民交通出版社,2000..
  • 3交通部第一公路工程总公司.公路施工手册·桥涵[M].北京:人民交通出版社,2000..

二级参考文献1

共引文献15

同被引文献29

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部