摘要
二滩水电站是国际招标的水电工程,沙卵石骨料加工系统所采用的工艺流程和设备都是国际上较先进的。本文综合的介绍了料场开采、工艺流程、沙石系统的布置和主要设备的特点。
rtan Hydropower Station is a international competitive bidding project.Therefore,technologicalprocess and equipment used pgate processing plant are advanced in the world.Excavtion of borrow ar-eas,tecbnological process,layout of aggregate processing plant and main performances of equipment are presented to engineers in China for reference in design and construction.
出处
《四川水力发电》
1994年第A00期49-53,共5页
Sichuan Hydropower
关键词
砂石
骨料
生产
水电站
平面布置
设备
aggregate processing plant borrow area excavation technological process plan layoutequlpment