根据杭州湾跨海大桥IX-B合同段施工区域复杂的地质条件,结合业主提供的水文资料,对海洋浅水区域钻孔桩施工平台进行了优化设计,为类似工程的工作平台施工提供借鉴参考。
According to the complicated geological conditions in the construction area of Contract Section IX - B of Hangzhou Bay Cross-sea Bridge, based on the hydrological data provided by the Employer, the design of the drilling platform for bored pile construction is optimized, which can be used as reference for similar projects.
出处
《石家庄铁道学院学报》
2005年第B06期25-27,共3页
Journal of Shijiazhuang Railway Institute
关键词
杭州湾跨海大桥
施工平台
钻孔桩
Hangzhou Bay Cross-sea Bridge
construction platform