摘要
介绍了圆梁山隧道所穿越地区溶洞的地质概况与涌水渗漏情况,并详细介绍了溶洞涌水处理方案和化学注浆处理过程。
The article describes geological structure and gushing water of limestone cave in area where Yuanliangshan Tunnel goes through. It also details how to tackle gushing water problem and the process of chemical grouting.
出处
《中国建筑防水》
2005年第7期31-32,共2页
China Building Waterproofing