摘要
黄石垄水库大坝在坝底与基岩之间存在明显渗水现象,决定对坝基进行截渗处理。本文介绍了坝基截渗方案的选择,高压喷射灌浆的设计与施工等。检测结果表明,截渗效果完全满足设计防渗要求。
The geologic exploration shows that the seepage exists between the dam bottom and foundation rock. So the seepage water on the dam fundation should be controlled. The selection of impervious scheme, the design and construction of high pressure grouting technology are introduced in this paper. The inspection result indicates that the impervious effect is fully satisfied with the need of seepage control of the dam.
出处
《大坝与安全》
2005年第3期69-70,共2页
Dam & Safety
关键词
黄石垄水库
高压喷射灌浆
坝基截渗
方案选择
high pressure grouting, seepage cutoff on dam foundation, scheme selection, Huangshilong reservoir