拉西瓦水电站接入系统与西北750kV电网建设方案的研究 被引量:37

STUDY ON CONNECTING SYSTEM FOR LAXIWA HYDROPOWER STATION AND CONSTRUCTION SCHEMES OF 750kV NORTHWEST CHINA POWER GRID
下载PDF
导出
摘要 探讨了拉西瓦水电站接入系统与西北750kV电网发展的关系,按电源接入系统与电网建设协调配合的原则,经过论证提出了拉西瓦水电站的电气主接线和接入系统方案,指出了西北750kV目标网架的建设方向和具体实施方案,可为企业决策和项目建设提供参考。 The relation between the connecting system for Laxiwa hydropower station and the development of 750kV power grid in Northwest China is researched. According to the coordination principle of connecting system for power source with power grid construction and after the argumentation, the main electrical connection and the scheme of connecting system for Laxiwa hydropower station are proposed. The construction orientation of objective 750kV Northwest China power grid and its concrete implementation schemes are pointed out and the obtained conclusions can be available for reference to other similar project.
作者 黄明良
机构地区 西北电力设计院
出处 《电网技术》 EI CSCD 北大核心 2005年第13期20-25,共6页 Power System Technology
关键词 西北电网 拉西瓦水电站 电气主接线 接入系统 目标电网 Construction Electric connectors Electric industry Electric power transmission networks Project management
  • 相关文献

参考文献9

二级参考文献29

  • 1郑健超.金沙江大容量水电远距离输送方式的选择[J].中国电力,2003,36(9):5-10. 被引量:2
  • 2朱成章.世界能源的未来[J].中国电力,2003,36(9):11-20. 被引量:3
  • 3何大愚.柔性交流输电技术的定义、机遇及局限性[J].电网技术,1996,20(6):18-24. 被引量:32
  • 4..电力系统安全稳定导则[S].国家经贸委,2001..
  • 5.2006年前陕西330kV电网建设投产规划[Z].陕西电力公司,2002..
  • 6.2010年西北电网规划[Z].国家电力公司西北电力设计院,2001..
  • 7.电力系统运行方式工作管理规定[Z].国家电力公司,1999..
  • 8.陕西电网2002年度运行方式[Z].陕西电力调度中心,2002..
  • 9.西北电网公伯峡水电站送出工程及750kV示范工程(第01卷总论)[Z].国家电力公司西北电力设计院,2002..
  • 10.西北电网公伯峡水电站送出工程及750kV示范工程(第02卷电力系统)[Z].国家电力公司西北电力设计院,2002..