国道213线合作-郎木寺段改建工程路基处理技术 被引量:5

Embankment-Engineering Techniques for Rebuilding the National Highway 213 from Hezuo to Langmusi
下载PDF
导出
摘要 在分析国道213线合作郎木寺段原有公路病害类型及机理基础上,总结和研究了改建工程中该路段不良路基的处理技术.季节性冻结、腐殖土、黑土及沼泽湿地是合作-郎木寺路段改造工程中遇到的主要工程问题,根据不同路段具体的工程地点特征,采用了砂砾换填、抛石挤淤、铺设土工布等相应工程措施.近2a的实践证明,这些措施不仅对于防治道路冻胀、翻浆和路基沉降病害是有效的,而且对类似地区道路工程建设具有重要借鉴意义. Base on the analyses of the destroyed types and mechanisms of the National Highway 213 from Hezuo to Langmusi, which lies in a seasonal frozen soil region, the engineering techniques for solving frost heaving and frost boiling of embankment in the rebuild engineering are proposed. The average altitude of the highway is about {2 950 }~ {3 620 } m a.s.l. Meteorological data show that the maximal frozen depth in this area is 1 ^42 m. There is a large amount of soft soil, such as humus soil and black land along the highway, as well as swamp, which damage the way construction and operation. The original way had suffered heavy damages from cold weather and bad engineering geological conditions. In the rebuilding engineering of the highway 213 from Hezuo to Langmusi, designers adopted some engineering techniques in accordance with the engineering conditions of different sections of the way. Replace-filling embankment with gravel and riprap for extruding silt are built. Geotextile is also used to strengthen the embankment and obstruct moisture into the embankment. Practice shows that the engineering techniques are effective in preventing frost heaving and frost boiling of embankment. These techniques are also applicable to the areas of similar condition.
作者 辛平
机构地区 甘肃省公路学会
出处 《冰川冻土》 CSCD 北大核心 2005年第3期449-453,共5页 Journal of Glaciology and Geocryology
基金 甘肃省交通厅与中国科学院兰州分院科技合作项目"甘肃省季节冻土区公路路基修筑技术研究"资助
关键词 路基 季节冻土 处理技术 软土 沼泽 mbankment seasonal frozen ground engineering technique soft soil swamp
  • 相关文献

参考文献10

二级参考文献38

  • 1王康臣,郑治.填石路堤修筑技术的发展[J].广东公路交通,1999,25(C00):180-184. 被引量:2
  • 2吴青柏,童长江.冻土变化与青藏公路的稳定性问题[J].冰川冻土,1995,17(4):350-355. 被引量:84
  • 3季国良,邹基玲,吕兰芝.藏北高原地面加热场的季节变化[J].高原气象,1997,16(1):1-9. 被引量:45
  • 4武jin民 喻文学.高原多年冻土道路工程研究报告集[J].西安公路学院学报,1986,.
  • 5吴紫汪 程国栋.冻土路基工程[M].兰州:兰州大学出版社,1988..
  • 6B.A.库德里亚夫采(苏).工程地质研究中的冻土预报原理[M].兰州:兰州大学出版社,1992..
  • 7叶笃正 张捷迁.青藏高原加热作用对夏季东亚大气环流影响的初步模拟试验[J].中国科学,1974,3:301-320.
  • 8季国良.青藏高原西部地区地表净辐射与气候年际变化的相关分析.青藏高原气象科学实验文集(二)[M].北京:科学出版社,1984.52-59.
  • 9朱福康 赵卫.青藏高原地面净辐射对大气环流作用的一些观测事实.青藏高原气象科学实验文集(三)[M].北京:科学出版社,1987.54-61.
  • 10黄荣辉.青藏高原上空热源异常对北半球大气环流异常的作用[J].气象学报,1985,43(2):208-220.

共引文献212

同被引文献104

引证文献5

二级引证文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部