摘要
在介绍工程变更的分类及审批原则的基础上,阐述了施工过程中工程变更的具体实施与操作细则,包括申报审批程序及变更单价的确定等。
Based on introducing the classification and approval principles of the engineering alternation, this paper expounds the concrete measures and operation procedures of the engineering alternation in the course of the construction, which include the examination and approval procedures, and the determination of the unit price, etc.
出处
《科技情报开发与经济》
2005年第12期290-291,共2页
Sci-Tech Information Development & Economy
关键词
工程变更
审批原则
审批程序
变更单价
engineering alternation
approval principles
approval procedures
alternation of unit price