摘要
简述了南昌市前湖电排站工程的泵房基础情况.介绍了采用井管降水法进行该工程施工期间地下水排降处理,效果较好.
<Abstrcat> The foundation content of pump house of Qian Lake Electric Storm Drainage and Irrigation Station in Nanchang city is stated.The application of the well-pipe drainage method is introduced in order to lower the groundwater elevation in the construction period of this project.The effect is good.
出处
《江西水利科技》
2005年第2期104-106,共3页
Jiangxi Hydraulic Science & Technology
关键词
前湖电排站
泵房
基础开挖
施工
井管降水法
应用
Qian Lake Electric Storm Drainage and Irrigation Station
Well-pipe drainage method
Application