半逆作法施工组织及质量监控 被引量:3

The half against method construction organizes and the quantity supervises and control
下载PDF
导出
摘要 通过对广州花园酒店三层地下车库采用半逆作法施工技术的实践,总结了采用该施工方法时,现场施工、监理人员怎样对结构质量进行有效控制的方法及重点,以及在施工地域狭小,工期紧张时采用该方法的优越性,供现场施工及监理人员参考。 This text introduce Guangzhou garden hotel three underground garage adopt half against technology that method construct,while summarizing this construction method of adopting ,construct live,how to carry on the method to control to structure quality effectively and focal point to manage personnel,and adopt the superiority of this method when the region of constructing is narrow and small ,tense in time limit for a project. For constructing and managing personnel to participate in live.
作者 谢志民 莫谊
出处 《湖南理工学院学报(自然科学版)》 CAS 2005年第2期69-71,共3页 Journal of Hunan Institute of Science and Technology(Natural Sciences)
关键词 半逆作法施工 地下连续墙 导墙 空桩 槽段 half against method underground continuous wall lead the wall empty pile slot segment
  • 相关文献

参考文献2

  • 1JGJ 94-1994.建筑桩基技术规程[S],1994.
  • 2GB 50319-2000.建设工程监理规范[S],2000.

同被引文献7

引证文献3

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部