期刊文献+

云南水电丰枯出力的优化思考 被引量:1

OPTIMAL STUDY ON OUTPUT OF HYDROPOWER ABUNDANT YUNNAN POWER GRID DURING HIGH AND LOW WATER PERIOD
下载PDF
导出
摘要 云南拥有丰富的电力资源和广阔的市场,随着大型水电站的开发,云南电源水电比重偏大,不可避免地存在丰枯出力悬殊的问题。对解决此问题从加大火电比例、兴建具有调节性能电站和实施梯级联合运营、加强需求侧管理等方面给予讨论。 Yunnan Province is affluent in energy sources and has a big market . With some hydro-power station exploiting, the hydro-power has a big proportion, it is natural to produce very different power in rainy and sear season. To solve the problem, the topic gives some piece of discuss, such as increasing the coal power, building the adjustive hydro-power station and implementing rundle unit operation, strengthening the demand side management.
出处 《云南地理环境研究》 2005年第4期93-95,共3页 Yunnan Geographic Environment Research
关键词 电力资源 电力市场 丰枯出力 需求侧管理 electric power resource electric market power in rainy and sear season demand side management
  • 相关文献

参考文献3

共引文献1

同被引文献9

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部