印尼Paiton电厂的开发经验及教训分析
被引量:1
A case study: Paiton power plant in Indonesia
摘要
本文通过分析印尼Paiton电厂项目,找出其不成功的原因,吸取经验教训,避免重蹈覆辙.主要的经验教训是:①市场对项目产品的需求比购买担保更重要,购买协议中应包括适当的控制措施保证产品的需求;②注意电价调节机制作为降低风险措施的局限性,应预测极端事件并把它排除在收费调节机制之外;③尽量降低单位成本(整个项目生命周期成本),避免建造非生产性设施;④注意"高风险高回报"风险管理策略的不利因素,避免该风险管理策略用于纯风险.这些教训对今后类似的电厂项目有重要的参考价值.
出处
《项目管理技术》
2005年第7期18-22,共5页
Project Management Technology
同被引文献12
-
1YE S,LIU Y.Study on Development Patterns of Infrastructure Projects[J].Journal of Construction Engineering and Management,2008,134(2):94-102.
-
2TIONG R L K.YEO K T,MCCARTHY S C.Critical Success Factors in Winning BOT Contracts[J].Journal of Construction Engineering and Management,1992,118(2):217-228.
-
3TIONG R L K.CSFs in Competitive Tendering and Negotiation Model for BOT Projects[J].Journal of Construction Engineering and Management,1996,122 (3):205-211.
-
4ZHANG X.Critical Success Factors for Public-Private Partnerships in Infrastructure Development[J].Journal of Construction Engineering and Management,2005,131(1):3-14.
-
5ALBERT P C.Chan; Patrick T.I.Lam; Daniel W.M.Chan,Esther Cheung; and Yongjian Ke.Critical Success Factors for PPPs in Infrastructure Developments:Chinese Perspective[J]Journal of Construction Engineering and Management,2010,136 (5):484-494.
-
6Zhen-Yu Zhao,Jian Zuo,George Zillante,et al.Critical Success Factors for BOT Electric Power Projects in China:Thermal Power versus Wind Power[J].Renewable Energy,2010,35:1283-1291.
-
7YE S,LIU Y.Major Pitfalls in Developing Independent Power Projects[C]//Proceedings of 2007 International Conference on Construction and Real Estate Management,21-22 August 2007,Bristol (UK):349-354.
-
8YE S,TIONG R L K.Government Support and RiskReturn Trade-off in China' s BOT Power Projects[J].Engineering Construction and Architectural Management,2000,7(4):412-422.
-
9YE S,TIONG R L K.Public-Private Partnerships for Power Projects:A Case Study of Hub Power Project[J].Journal of Financial Management of Property and Construction,2004,9(3):75-89.
-
10YE S,Tiong R L K.Effects of Tariff Design in Risk Management of Privately Financed Infrastructure Projects[J].Journal of Construction Engineering and Management,2003,129(6):610-618.
-
1顾宗豪.控制非生产和电之我见:谈当前非生产性用电猛增原因及对策[J].浙江电力,1993(2):58-59.
-
2熊莉,张静.浅议增值税改革背景下的项目生命周期成本控制[J].财会学习,2012(7):17-18.
-
3ABB推出新一代145kV气体绝缘金属封闭开关设备[J].电气技术,2013,14(11):85-85. 被引量:1
-
4杨书臣.近年日本市场体系建设的新进展[J].现代日本经济,2007,26(1):30-34. 被引量:2
-
5孙敬水,张品修.台湾经济增长方式转变的经验及教训[J].世界经济与政治,1998(5):74-78. 被引量:5
-
6李金侠.论美国西部开发对我国开发西部的启示[J].渭南师范学院学报,2003,18(3):24-25.
-
7朱冬林.浅析我国风险投资发展中存在的问题及对策[J].工业技术经济,2004,23(5):40-41.
-
8胡琼,陈盈颖.电子商务进入澳门国旅战略问题探讨[J].湖北广播电视大学学报,2009,29(8):102-103.
-
9控制转速 控制成本[J].现代制造,2007(23):37-37.
-
10控制转速 控制成本[J].机电产品市场,2007(9):39-39.