公路桥梁140m长预应力孔道压浆质量控制 被引量:15

Quality Control of Press Grouting of a 140 Meters Prestressed Duct of Road Bridges
下载PDF
导出
摘要 对长度超过100m的长线孔道,采用标准的真空辅助压浆施工工艺,用专用外加剂配制出水灰比小于0.35的水泥浆,配合专用的压浆设备,由专业施工队伍严格按照标准操作工序进行压浆施工,可以从根本上保证压浆质量。本文通过30m长试验梁的试验研究和140m长孔道实际工程的压浆施工,分析了保证超长公路桥梁预应力孔道压浆质量的方法和措施。 To ensure the press grouting quality of long line ducts over 100 meters, engineers adopted the standard assistant press grouting construction method, used special agents to prepare cement mud whose water-cement ratio is smaller than 0.35, selected professional press grouting device and construction teams, and kept standard operation procedures. In this article, authors analyze methods and measures which can ensure press grouting quality of prestressed ducts of road bridges, according to test study of a 30 meters beam and practical press grouting construction of a 140 meters duct.=
出处 《施工技术》 CAS 北大核心 2005年第7期59-60,73,共3页 Construction Technology
关键词 公路桥梁 预应力 真空辅助压浆 质量控制 road bridge prestress vacuum assistant press grouting quality control
  • 相关文献

参考文献3

  • 1R. D. Lapsley. Recent advances in vacuum grouting techniques and grout mix design[J]. Grouting of Post-Tensioned Structures,1991,(3-4).
  • 2Hope B.B., Ip A.K.C. Grout for post-tensioning ducts[J]. ACI Material Journal,1988,(7-8).
  • 3DGJ08-235-1999.后张预应力施工规程[S].[S].,..

共引文献1

同被引文献36

引证文献15

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部