8FORDVEE K, SULLIVAN G G. Logistics management system( LMS): integrating decision technologies for dispatch scheduling in semiconductor manufaeturing[M]. San Francis co, Cal. , USA:Morgan Kaufmann,1994:465-532.
9肖田元,范玉顺,姚小冬.面向负荷的生产控制[M].北京:清华大学出版社,1999.3~4.
10Spearman M L, Woodruff D L, Hopp W J. CONW IP: A Pull alternative to Kanban[J]. International Journal of Production Research, 1990,28(5):879-894.