期刊文献+

隧道初期支护整体下沉的处理 被引量:1

The Treatment of the Integral Sinking of Early Support Tunnels
下载PDF
导出
摘要 辽宁省丹东至本溪高速公路下马塘隧道左线进口较大范围内位于浅埋黄粘土地段,含水量大、强度低,施工时又过于冒进,造成了已做好的约17m的初期支护整体下沉,地表出现了大面积塌陷事故。分析了事故产生的原因、整治方案的选择及主要施工工艺,为今后软弱土层地段的施工和事故处理提供一定的参考意见和经验。 The left route entrance in Xiamatang tunnel of the expressway from Dandong to Benxi in Liaoning province lies the shallow buried yello clay section over a fairly wide range. It has high water content and weak integral. To rashly advancing in construction causes the integral sinking of completive early support 17 metres long, collapse accidents over large areas have arisen on the earth's surface. The reasons of resulting in accidents, selection of control and main construction technique are mainly analyzed, which can proride a certain reference and experience for the future construction and treatment of accidents in weak soil layer sections.
作者 金海
出处 《西部探矿工程》 CAS 2005年第9期113-114,118,共3页 West-China Exploration Engineering
关键词 黄粘土 含水量 中隔墙法 自钻式锚杆 yellow clay water content middle cross wall method automatic anchor
  • 相关文献

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部