摘要
本文通过对下花园电厂二灰场筑坝石料最佳级配及抗剪强度的试验分析,得出了用于上坝石料的级配与其堆石密度及抗剪强度之间的关系,同时还给出了适宜上坝堆石的粒径范围和级配包线,为该灰场透水堆石坝的设计提供了可靠的依据。
In this paper, the relationship among the grading, rockfill density and shear strength of materials rockfill has been obtained by an experiment analysis for the optimum grading and the shear strength of filling dam rockfill in Number 2 Ash Site of Xia Huayuan Power Plant and also in this paper the limit of right filling dam rockfill size and the limit of its grading curve have been given, providing the reliable basis for designing the pervious rock fill dam of this Ash Site.
出处
《华北水利水电学院学报》
1995年第3期34-38,共5页
North China Institute of Water Conservancy and Hydroelectric Power