摘要
详细叙述锦天化合成氨/尿素装置考核前的准备工作、考核过程、考核结果及考核中发现的问题。
This paper describes in detail the preparation,the process and the result of the perfor-mance test as well as the problems discovered during the test.
出处
《大氮肥》
1995年第4期273-276,共4页
Large Scale Nitrogenous Fertilizer Industry