摘要
针对ISUP协议的特点,借鉴钳形渡口(FerrvClip)测试方法的思想,用一种新方法实现ISUP协议一致性的分布法测试。该方法的优点在于解决了上测试器和下测试器之间的同步和协调问题,实现了上测试器的自动化并减小了其实现的复杂度。
On the basis of the characteristics of the ISUP protocols,a new method empbying theidea of the ferry clip testing method is presented to implement the ISUP protocol conformancetest. The merit of the new implementation method is that it solves the problem of synchronizationand ccordination between the LT and UT within the ISUP conformance test system,and it iseasv to realize the automation of the UT.
出处
《北京邮电大学学报》
EI
CAS
CSCD
1995年第4期19-24,共6页
Journal of Beijing University of Posts and Telecommunications
基金
国家自然科学基金