期刊文献+

三峡电站厂房尾水管温度应力仿真计算分析 被引量:5

Analog Computations and Analysis of Temperature Stress of Powerhouse Draft Tube of Three Gorges Project
下载PDF
导出
摘要 采用有限元法,对三峡水利枢纽电站厂房尾水管弯管段和扩散段两个典型断面,取不同的浇筑季节(冬、秋、夏三季)、不同骨料(人工和天然)的混凝土,进行了模拟施工过程的温度场及温度应力仿真计算分析。 In this paper ,the analog computation of concrete’s temperature fields and temperature stress of the powerhouse draft tube of TGP was made.In oder to simulate the placement processes ,the FEMwas used ,for a selected bend section and a divergent section that are typical sections , in threeplacement seasons ,i.e. , winter ,autumn and summer , and with two kinds of aggregates,1.e.,artificial and natural.The computation results and analysis of all the cases for implementing full-faceplacement of ceiling are introduced.
作者 彭景文
出处 《长江科学院院报》 CSCD 北大核心 1995年第4期26-31,共6页 Journal of Changjiang River Scientific Research Institute
关键词 水电站厂房 尾水管 温度应力 扩散段 仿真 draft tube bend section divergent section full-face placement temperature stress temperatue field Three Gorges Project
  • 相关文献

参考文献1

同被引文献29

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部