摘要
广州市地下铁道一号线工程车辆段位于软土地基上,为防止软土地基病害,对不同性质的软土进行了大量的土工分析测试。以此为基础,对其工程地质条件和建筑适应性进行了评价,对不良地基土层提出了相应的工程处理措施。
The rolling-stock station of No.1 line of Gongzhou subway is located on soft soil groundIn order to prevent from the harmful problems caused by soft ground a lot of soil tests were conducted for soft soils of different properties. On this basis the engi-neering geological condition of soft soil and its adaptability to construstion were e-valuated,and the treatment methods were proposed for bad soil layers of ground.
出处
《地质灾害与环境保护》
1995年第2期42-45,23,共5页
Journal of Geological Hazards and Environment Preservation